On this page
- What happens on installation day?
- How are Fox Cities gutters sized?
- What does winter add to the plan?
- Which gutter types are available?
- How do the downspouts fit in?
- What belongs on the written estimate?
- What do national price guides say?
- Is the roof edge ready for new gutters?
- Should gutters wait for a new roof?
- How do you get ready for the crew?
- What should you check after the crew has gone?
What happens on installation day?
A good crew follows much the same sequence on every house.
- Survey. Each eave is measured, and the roof plane feeding it is noted, including any upper roof that empties onto a lower one.
- Fascia check. Boards that are soft, split or stained are replaced before anything is fixed to them.
- Sizing. Each run gets the size its roof needs. Front and back rarely need the same.
- Outlet plan. Downspouts are placed so none is overloaded and none empties against the foundation or across a walk.
- Forming. The machine on the trailer rolls coil into a continuous gutter cut to each eave, so the only joints are at corners.
- Fall. Each run is set to fall about a quarter inch every ten feet toward its outlet, so water drains instead of sitting and freezing.
- Hanging. Hidden hangers are screwed into solid wood at a spacing that will carry ice as well as rain.
- Finishing. Corners and end caps are sealed, downspouts and extensions fitted, and water is run through every gutter before the crew packs up.
How are Fox Cities gutters sized?
On the worst few minutes of a storm, not the yearly rainfall. NOAA's Atlas 14 gives Appleton a 10-year, five-minute intensity of roughly 6.44 inches an hour. Fed into the This Old House sizing method at a 6/12 pitch, that works out at about:
| Gutter | Roof one run can drain |
|---|---|
| 5-inch K-style | about 780 sq ft |
| 6-inch K-style | about 1,125 sq ft |
| 5-inch half-round | about 355 sq ft |
| 6-inch half-round | about 540 sq ft |
Measure the plane flat: eave length times the level distance back to the ridge. Most single-storey houses in the area fit inside the 5-inch figure. The back of a big two-storey house, a valley that pours into one corner and a steep roof are the usual cases for 6-inch. There is more in 5-inch vs 6-inch gutters and on the 6-inch gutters page.
What does winter add to the plan?
A load summer never brings. In practice that means:
- Hangers driven into rafter tails or solid fascia with screws rather than spikes, close enough that a trough full of ice stays straight.
- Coil of .032-inch aluminum or heavier, which holds its shape under weight.
- Position under the drip edge and a little below the line of the roof, so a sheet of sliding snow is more likely to pass over than catch the lip.
- Outlets big enough to clear meltwater, with extensions placed so the water does not refreeze on steps and walks.
None of this stops ice dams. Those come from attic heat, as University of Minnesota Extension explains, and the fix is air sealing and insulation. See ice dams and gutters.
Which gutter types are available?
| Option | Why choose it | Keep in mind |
|---|---|---|
| Seamless aluminum | Rust-free, light, wide color range, fair price | Ask for .032-inch rather than .027 |
| Seamless steel | Stiff; resists dents and ice load | The coating has to stay whole |
| Copper | Lasts for decades; darkens with age | High cost; runoff can stain light stone |
| Half-round | Suits older and period houses | Carries less than K-style of the same width |
Seamless aluminum K-style is on most Fox Cities houses. Copper and half-round turn up on older homes and high-end new builds.
How do the downspouts fit in?
They do half the work. A 2x3-inch downspout suits a short run; a 3x4-inch carries roughly twice the flow and is much less likely to choke on maple seeds or freeze solid. Discharge matters as much as size: at least four feet out, onto ground that falls away, and never across a walk where it will ice. See downspouts and downspouts and wet basements.
What belongs on the written estimate?
- Profile, size and metal thickness for each run.
- Hanger type and spacing.
- How many downspouts, what size, where each goes and where it discharges.
- Fascia or soffit work, shown as its own line.
- Guards, if any, by type.
- Taking down and hauling away the old system.
- Any buried line, its outlet, and who files the Diggers Hotline request.
- What the installer stands behind on labor, and the coil maker's terms on metal and finish.
What do national price guides say?
Angi and This Old House put installed 5-inch seamless aluminum at about $9 to $13 a foot, 6-inch at $12 to $18, steel at $6 to $14 and copper at $25 to $40. What gutters cost in Appleton covers what moves a quote up or down.
Is the roof edge ready for new gutters?
Look along the eave before the estimate visit. A drip edge should lap down into the gutter so water cannot run behind it. If there is none, or it is bent, ask for one to be fitted with the gutters. Shingles should overhang the fascia slightly; if they stop short, water will find the gap.
Should gutters wait for a new roof?
If a new roof is coming within a year or two, it usually makes sense to time the gutters with it. The roofer replaces the drip edge, the fascia is exposed for repair, and new gutters do not have to be taken down and rehung. Ask the two crews to agree who fits the drip edge.
How do you get ready for the crew?
Clear the driveway so the forming trailer can park close, move anything fragile from beside the walls, unlock side gates, point out any buried lines or sprinkler heads you know of, and settle on a color before the day.
What should you check after the crew has gone?
Walk each side. Runs should look straight with an even fall, corners should be neatly sealed, downspouts should sit tight to the wall and extensions should carry water well clear. If no one ran a hose through, ask for it. Check the beds and lawn for offcuts and screws.
Before you hire in Wisconsin
The state does not run a general contractor license or exam, according to Housecall Pro's state summary. The credential that matters is linked to permits: when a building permit for a one- or two-family dwelling is pulled by anyone other than the resident owner, that person needs Dwelling Contractor certification and a named Dwelling Contractor Qualifier. Plenty of gutter jobs need no permit, so find out whether yours does and who would take it out.
- Request proof of liability cover issued to the business itself, and look at the policy period.
- Have every detail on paper before work starts: profile, size and metal thickness, how the gutter is hung and how far apart the hangers sit, downspout count and size, each discharge point, and who hauls away the old system.
- Find out what the installer stands behind on labor, and what the coil maker stands behind on the metal and paint.
- Where a buried line or any digging is part of the plan, the contractor should file a Diggers Hotline request first; ask for the ticket number.
To have a contractor measure your house, call (920) 280-3923.
